Rapid RC

Saturday, 2 May 2020

Concorde build

Hi, progressing slowly finished the fairings from elevons to Fus inc covering (that was a days work). Built the engine pods and covered the inside to tidy up, loosely fitted now. Not going to fit them until after the wing is covererd then cut away film it makes life easier when covering wings. Started constructing front nose section.
Keep safe Peter & Elaine




3 comments:

  1. Looking good are booking the field for your Maiden as will a queue for first flight and testing after the lock down ends.

    ReplyDelete
  2. Hi Richard, Put my name down on the list I will have my large dv11 to test as well. Will it be a time slot or day slot?
    Peter

    ReplyDelete

Note: only a member of this blog may post a comment.